Date of Posting 01/01/2018
Industry Type Power T&D
Qualification BE / B Tech / ME / M Tech
Specialization Electrical Preferred
Total Experience 10 to 15 Years
Country of Employment Qatar



Job Description

We are looking for Indian candidates currently available in India to join immediately for following positions available with our client, an International EPC Contractor in Qatar. If you are currently available in Qatar on Visit / Business Visa OR having NOC from current employer, please feel free to call after sending your CV as per guidelines given below.

1.  Planner / Scheduler

Candidate Profile Required:
1 You are Engineering Graduate preferably in Electrical Disciple (Four Years Full Time Degree Course)
2 You have 10 to 12 Years relevant experience in GIS Substation Projects with EPC Contractor
3 4 to 5 years experience in gulf is a must.
4 Candidates having experience on KAHRAMAA Projects will be highly preferred.


2.  Planning Engineer

Candidate Profile Required:
1 You are Engineering Graduate preferably in Electrical Disciple (Four Years Full Time Degree Course)
2 You have 10 to 12 Years relevant experience in GIS Substation Projects with EPC Contractor
3 4 to 5 years experience in gulf is a must.
4 Candidates having experience on KAHRAMAA Projects will be highly preferred.

If your profile matches above criteria and you are genuinely interested, Apply immediately using following guidelines:
  • Mention the position you wish to apply for in Email Subject Line
  • Send your updated CV only and it should be in Word Format.
  • Do not send any other attachments like Passport or Certificates copies. We will ask later if needed.
  • Please provide the following information in the email body:
1. Qualifications: 
2. Total Experience: 
3. Gulf Experience: 
4. Joining Time: 
5. Availability Of NOC: 
6. Possibility Of Visa Transfer: 
7. Current Employer: 
8. Current Salary: 
9. Current Location: 
10. Current Contact Numbers: 
11. Skype ID: 

Please Like / Comment / Share on WhatsApp  / LinkedIn  / Facebook  / Google Plus / Twitter  for benefit of your friends, colleagues and other job seekers.

Regards
Team Vansh Consulting
Email resume@ vanshconsulting.com
Mobile / WhatsApp: +91-8177933841
LinkedIn Profile: www.linkedin.com/in/jagiasi-purshottam 
LinkedIn Company Page: https://www.linkedin.com/company/vansh-consulting